Campbell Grading, Inc.

Recent news and updates from this project

January 13, 2012

Campbell Grading, Inc.: A Beautiful Place to Work
Soon the public will be able to enjoy these views as well. Read more

Campbell Grading, Inc.: The Golden Gate Overlook is taking form through Golden Bay Construction
Liz, our project manager, inspecting the formwork. The overlook forms receiving concrete. Adding the donor lettering to the center of the overlook. read more Read more

Campbell Grading, Inc.: Extension Trail
An extension trail was added to our Presidio Coastal Trail & Golden Gate Overlook project, in order to make a smooth transition from the new work, created by Campbell Grading, Inc., to the existing trail that parallels Lincoln Blvd and the ocean. The trail also addresses the erosion problem caused from the street run-off. Read more

January 6, 2012

Campbell Grading, Inc.: H-beam Wall Moving Along
The H-beam wall beams have been put in place and the wall has been backfilling with gravel wrapped with fabric. Read more

December 16, 2011

Campbell Grading, Inc.: Golden Gate Overlook Structural Slab and Formwork
The form work is underway at the Golden Gate Overlook and the structural slab for the stone has been poured.   Golden Bay Construction, our subcontractor, poured 117 cubic yards of concrete for the structural slab at the Golden Gate Overlook. Read more

Campbell Grading, Inc.: H-beam Wall Progression
We have continued with building the H-beam wall for the Presidio Coastal Trail and Golden Gate Overlook. The following pictures show our progression over the last week. The holes for the I-beams were drilled.   These piles are the soil that was drilled out of the I-beam holes.   read more Read more

December 15, 2011

Campbell Grading, Inc.: Site Development and Habitat Improvements at El Polin Springs
Short Description:  For the Presidio Trust Presidio of San Francisco, CA Completed: 2011   Campbell Grading, Inc. diligently worked to restore the ecology of El Polin Springs and showcase the archeology of the site. El Polin Springs is part of Tennessee Hollow, the Presidios... Read more

December 6, 2011

Campbell Grading, Inc.: Hydrological Restoration at Muir Beach Emergency Access Road
Short Description:  For the National Park Service and the Golden Gate National Parks Conservancy Marin County, CA Completed: 2010 Normal 0 false false false EN-US X-NONE X-NONE... Read more

December 2, 2011

Campbell Grading, Inc.: The Lincoln/Merchant Connector Stairs and Behind the Golden Gate Overlook
Behind the Golden Gate Overlook everything is at finished grade and Barth's surfacing has been put down. Erosion control buttons up the area. Box steps with Barth's surfacing has been put in leading up to the connector stairs at the Lincoln and Merchant Intersection. read more Read more

Campbell Grading, Inc.: Significant Progress has been made at the Presidio Coastal Trail and Golden Gate Overlook
These photos show some of the progress that has been made from Merchant Parking lot up to the Golden Gate Overlook. Currently there is a lot of work being done at the Golden Gate Overlook. Pipes and drains are being put in and the concrete work is under way. read more Read more

October 24, 2011

Campbell Grading, Inc.: El Polín Springs Opens & the SF Chronicle Writes an Article
El Polín Springs openned last week. Check out SF Chronicle's glowing and informative review.   Read more